Sort by

Urgent

Chao Ting International Real Estate Co., Ltd ( Construction-Building-Architecture )
• Carry out installation of different types of air conditioning system such as single split system and VRF system • Carry out testing and commissioning together with the AC supplier. • Performs system process like leak testing, vacuuming and refrigerant charging.
  • Full Time |
  • Phnom Penh |
  • Junior Executive |
  • Engineering
Posted on : 24 Apr 2024

JCM Nippon Private ltd ( Construction-Building-Architecture )
- Prepares schematic, preliminary, and final drawings for landscaping projects. - Performs general drafting work such as site plans, maps, and working sketches. - Collects and compiles grounds maintenance data. - Plots topographic surveys. - Performs related work as required.
  • Full Time |
  • Phnom Penh |
  • Junior Executive |
  • Sales-Corporate
Posted on : 24 Apr 2024

Chao Ting International Real Estate Co., Ltd ( Construction-Building-Architecture )
• Coordinate all site inspections with Site Engineers and Sub contractor • Ensure that all inspection reports are accurate and all attached documents are in current status • Assist construction team for resolving issues and discrepancies • Coordinate with construction team to ensure that communication/coordination exist and maintained • Prepare site instruction and non-conformance report and assist developing corrective actions. • Propose an optimization options to QC Manager in order to solve any conflict between Architectural drawings, other trade discipline and conditions of construction. • Performs document filing for all related Architectural/Civil documents as per quality management system (QMS) procedure. • Perform other related job assigned by QC Manager
  • Full Time |
  • Phnom Penh |
  • Senior Executive |
  • Engineering
Posted on : 24 Apr 2024

Urgent

The MoonCity (Cambodia) Project ( Construction-Building-Architecture )
• Create world class, user centered designs through considerations of user research, business requirements, customer feedback and usability study findings. • Develop conceptual diagrams, wireframes, visual mockups, prototypes and visual design of web and mobile applications. • Develop and maintain detailed user interface specifications. • Present design works to user experience, product, business owners for review and feedback. • Work with product and data team to assess and optimize new and existing features and page frameworks • Provide usability recommendations based on industry best practices, analytics, and user behavior.
  • Full Time |
  • Phnom Penh |
  • Junior Executive |
  • Architecture-Interior Design
Posted on : 24 Apr 2024

Eco Plant Co.,Ltd ( Construction-Building-Architecture )
- Receive material request - Withdraw material for requester - Prepare purchase request - Receive and check invoice with material - Collect all withdraw material voucher - Input date for stock in and out - Check balance remain with actual material in warehouse - Submit report on time - Other task assign by warehouse supervisor
  • Full Time |
  • Phnom Penh |
  • Junior Executive |
  • Stock/Inventory Control
Posted on : 24 Apr 2024

Urgent

JCM Nippon Private ltd ( Construction-Building-Architecture )
- Present and sell the company products and services to existing and potential customers - Identify sales prospects and contact these and other accounts as assigned - Prepare action plans and schedules to approach specific targets and to project the number of contacts to be made - Follow up on new leads and referrals resulting from field activities and researches - Develop and maintain sales materials and current product knowledge - Identify and resolve client concerns and complaints in your assigned territory - Communicate new product and service opportunities, special developments, information or feedback gathered through field activities to the supervisor - Confer with potential customers regarding product and service needed - Responsible for payment collection of assigned accounts - Attend meetings, sales and product trainings or other events as assigned - Write reports and update the department management on a regular basis about the job and the market.
  • Full Time |
  • Mondulkiri |
  • Senior Executive |
  • Manufacturing
Posted on : 24 Apr 2024

Eco Plant Co.,Ltd ( Construction-Building-Architecture )
- Check quality control on concrete and pile production - Create mix design for concrete - Create drawing of spun pile and solid pile - Control labo lap - Produce testing result on time - Can visit site work - Assist to site supervisor to manage worker if need - Costing calculate for production and save cost - Other work assign by CEO
  • Full Time |
  • Phnom Penh |
  • Senior Executive |
  • QC/QA
Posted on : 24 Apr 2024

LIM HENG GROUP ( Construction-Building-Architecture )
- Daily checking for all outlet sales. - Make an order to purchasing department to refill its requirement for required outlets. - Check items received, enter/check items received into POS system. - Perform physical count and produce report for required outlet in daily manner. - In well-cooperated with Income Auditor in daily process. - Check and monitor all cashiers for all outlets sale to make sure all cash receipts are confirmed with sale invoices/receipts. - Check daily items expiration/spoilage and report to management. - Conduct month end for physical stock count for all related outlets sale. - Stock reconciliation and stock movement report for required outlets. - Perform stock adjustment as required. - Ensure that all stock inwards and outwards and all relevant stock control activities are appropriately performed according to the Company’s procedures. - Other tasks as assigned from management.
  • Full Time |
  • Oddor Meanchey |
  • Senior Executive |
  • Stock/Inventory Control
Posted on : 24 Apr 2024

Urgent

Cam.E.S Co.,Ltd ( Construction-Building-Architecture )
-Responsible on the work to meet the deadline. -Work with team to design, produce 2D & 3D drawing, construction drawing, detailing... -Be creative and willing to learn new things. -Good behavior, Hardworking, Flexible, Honest and Self-motivated and able to work under pressure. -Follow up the project with the client.
  • Full Time |
  • Phnom Penh |
  • Fresh/Entry Level |
  • Architecture-Interior Design
Posted on : 24 Apr 2024

LIM HENG GROUP ( Construction-Building-Architecture )
- Prepare Financial Report - Control Project progress -Prepare BOQ report - Verifies requested document - Conduct site visit - Other task
  • Full Time |
  • Phnom Penh |
  • Senior Executive |
  • Accounting
Posted on : 23 Apr 2024

LIM HENG GROUP ( Construction-Building-Architecture )
1. Making good communication with farmers. 2. Manage and control cash received and paid. 3. Inspecting and valuating cassava quality, dry or wet, to make sure it compliances with buyers’ requirement. 4. Issue purchasing invoices and payment to farmers. 5. Create sales invoices and documents for delivers/buyers. 6. Managing and control cassava stock. 7. Prepare all daily report for cassava accountant and managements. 8. Well prepare accounting document with records. 9. Doing daily and monthly reports. 10. Other transactions assigned by managements.
  • Full Time |
  • Oddor Meanchey |
  • Fresh/Entry Level |
  • Accounting
Posted on : 23 Apr 2024

LIM HENG GROUP ( Construction-Building-Architecture )
1. Monitoring and follow up all daily purchasing quantities and amounts. 2. Inspecting all cassava operation documents, purchasing invoices, payments, receipts, sales invoices, cassava stock adjustment and operation expenses. 3. Monitoring and follow up all daily sales quantities and amounts. 4. Check related party invoices in Sage Accpac 200. 5. Reconcile related party transactions with intercompany in the group. 6. Monitor and follow up balance with vendors and customers. 7. Well prepare accounting documents with records. 8. To monitor and controlling all purchase order requests to make sure they have been purchased on time need. 9. Checking all daily report from cassava accounting officers. 10. Preparing summary all daily report for managements. 11. Keep all cassava operation documents in safety place. 12. Other transactions assigned by managements.
  • Full Time |
  • Oddor Meanchey |
  • Non-Executive |
  • Accounting
Posted on : 23 Apr 2024

LIM HENG GROUP ( Construction-Building-Architecture )
1. Registering consumers list and received payments. 2. Check purchasing and sale invoices, then entry into Sage Accpac 200. 3. Check related party invoices/documents and reconciling in accounting system 4. Reconcile related party transactions with intercompany in the group. 5. Monitor and follow up balance with vendors and consumers (villagers). 6. Make payment to vendors and related. 7. Well prepare accounting document with records. 8. To monitor and controlling all purchase order requests to make sure they have been purchased on time need. 9. Doing daily and monthly reports. 10. Other transactions assigned by managements.
  • Full Time |
  • Oddor Meanchey |
  • Fresh/Entry Level |
  • Accounting
Posted on : 23 Apr 2024

LIM HENG GROUP ( Construction-Building-Architecture )
Management 1. Motivation staffs for doing the job. 2. Manage and control all AP, and related party in the company. 3. Review all purchasing and payment documents. 4. Doing job planning for team. 5. Monitor and follow up staffs work under supervision. 6. Organize all documents in proper manner and safe place. 7. Manage staff under supervision. 8. Do others management jobs. Transactions 1. Review suppliers invoice and posting AP batch into Sage system. 2. Review payment voucher (PV) and posting AP payment batch into Sage. 3. Review and verify on payment voucher to make sure it has enough supporting documents and accuracy of cash payment. 4. Review all recording of Purchasing order, AP receipt and invoice entry in the Sage system. 5. Review and verify on daily purchasing request. 6. Review and very on internal usage item in the company. 7. Preparing cost calculation worksheet and control. 8. Doing annual budget plan with management. 9. Do other transactions assigned by managements. Reports 1. Prepare AP vendor report. 2. Prepare AP aging report. 3. Preparing expenses report comparing with budget plan. 4. Monthly cash reconciliation report. 5. Other report assigned by management.
  • Full Time |
  • Oddor Meanchey |
  • Senior Executive |
  • Accounting
Posted on : 23 Apr 2024

Urgent

The MoonCity (Cambodia) Project ( Construction-Building-Architecture )
** Responsibilities - Manage homebuilding construction through all phases to ensure the delivery of a quality home. - Schedule subcontractors and delivery dates for materials. - Ensure all building codes and Meritage Home standards of quality are met. - Conduct walk-through inspections and other scheduled inspections with the homeowner. - Communicate safety standards to laborers and sub-contractors; enforces safety regulations on all job sites. - Maintain a clean and organized jobsite and subdivision. - Interact daily with various departments of company, subcontractors, customers, and city inspectors. - Attend Construction, monthly and quarterly meetings. ** For all positions: - Ability to establish and maintain effective working relationships with elected officials, coworkers, the press the general public and members of diverse cultural and linguistic backgrounds regardless of race, religion, age, sex, disability, political affiliation, gender identity or sexual orientation. - Ability to serve the public and fellow employees with honesty and integrity in full accord with the letter and spirit of all state, county and city ethics and conflicts of interest policies. Strong understanding of ethical behavior is required. - Ability to maintain regular and punctual attendance. ** Civil Engineer ** Position Summary Advanced professional and supervisory civil engineering work in the planning design, construction, inspection and maintenance of a variety of public works projects and facilities. ** Illustrative Examples of Essential Duties: - Participates and supervises in the preparation and production of construction plans and specifications for highways, bridges, water supply projects, street lighting projects, street parking, sanitary and storm sewer works, hydraulics, and other public works - Reviews field surveys to develop information required for design and construction of public works projects - Reviews plans for public works projects for compliance with standards - Prepares reports and makes preliminary feasibility studies for public works projects - Reviews permit applications for proposed utility installations and construction and makes recommendations to supervisors on effects to existing or proposed utilities - Acts as liaison between City and contractual engineers, utility companies, engineering firms and/or city departments engaged in construction - Participates in corrosion or erosion engineering work and control programs - Makes recommendations for construction and improvement of city facilities - Supervises the preparation of cost estimates for public works projects - Supervises and participates in preparation of City engineering procedures - Prepares and presents comprehensive reports and studies for public works projects - Reviews permit applications - Supervises the inspection of a wide variety of public works construction projects - Performs related work as required ** For all positions: - Ability to establish and maintain effective working relationships with elected officials, coworkers, the press the general public and members of diverse cultural and linguistic backgrounds regardless of race, religion, age, sex, disability, political affiliation, gender identity or sexual orientation. - Ability to serve the public and fellow employees with honesty and integrity in full accord with the letter and spirit of all state, county and city ethics and conflicts of interest policies. Strong understanding of ethical behavior is required. - Ability to maintain regular and punctual attendance. - For all technical, professional, supervisory and managerial positions: - Ability to develop innovative and creative solutions to issues consistent with the City's strategic plan. ** Minimum Requirements: - Currently registered as a Professional Engineer by recognized organization ** Physical Requirements: - Must have the use of sensory skills in order to effect
  • Full Time |
  • Pursat |
  • Senior Executive |
  • Architecture-Interior Design
Posted on : 23 Apr 2024

Stay in construction!!!

Stay in construction!!!